Showing posts with label slidell. Show all posts
Showing posts with label slidell. Show all posts

07 September 2011

Twin Spans Update

No pics from me on this one yet, as gas still costs too much.

The new I-10 Twin Spans are slated to be opened completely on Friday, September 9. Mark that day in your calendars - that's the day six lanes are open continuously across the lake.

It's long overdue.

Heads up, travelers!

Road work will impact I-12/I-59 interchange at Slidell Thursday (source: Times-Picayune)

This is what I live for...

Here's the gist of it - Thursday, September 8, 2011:
  • I-12 EAST: Right lane closed at mile marker 85.5 - Left lane open but expect delays
  • I-59 SOUTH: The ramp to I-10 eastbound will be CLOSED.
If you want to get to eastbound I-10 from I-59, the best way is to take the exit to I-10 WEST and turn around at one of the Slidell interchanges. I suggest Exit 265, Business US 190 - it's not quite as congested as Gause (US 190).

Closures start at 9 am and are expected to last til 2 pm.

10 June 2009

Interstate UPD*TE

...Wow, it rhymes.

Clinches
Highways: I-910, US 90-Z, LA 3046 (Clinched new flyover ramp), Spur LA 41

New:

I-910: 27 snaps of the westbound unsigned Interstate in New Orleans and on the Westbank.
Spur LA 41: Ten snaps, mostly covering westbound. Includes a lazy oddity for the AARoads Shield Gallery, should they want it.

Updated:

I-10: Added two pictures of eastbound at the I-12/I-59 split in Slidell.
I-12: Added ten pictures of eastbound from Airport Road to the I-10/I-59 split in Slidell. Finally got the other pictures in order. Geotagged those and fixed descriptions of some older pics.
I-59: Added twelve pictures of northbound from the southern terminus at I-10/I-12 in Slidell to Exit 5A in Pearl River.
US 11: Added a snap of the old bridge in Slidell and four snaps of the northbound concurrency with I-59 in Pearl River.
LA 59: Added two pictures at the reconfigured southern terminus.

To-do:

US 90: Need to add coverage of eastbound between Business US 90 near Westwego and I-10/I-910/Business US 90 in New Orleans, including snaps of the Huey P. Long Bridge. Also need to add those snaps between LA 1 and I-310.
US 90-Z: Need to add snaps of non-freeway portion westbound between I-910 end and US 90.
US 190: Need to add some assorted snaps.
Lake Ponchartrain Causeway: Need to completely replace northbound coverage.
LA 3046: Need to add a northbound snap or two.
North Causeway Approach: Need to add northbound coverage.

26 September 2008

...And it's done. Finally.

Times-Picayune - Fremaux interchange in Slidell now open



(Pic's not mine. -T)

Finally, damn it. It took them long enough...

17 September 2008

Slidell: I-10 Exit 265 almost done...

Times-Picayune - New I-10 interchange at Fremaux Ave. in Slidell nearly ready

This was one of the places me, Froggie, H.B. and a few others visited the weekend before Gustav hit. It's a nearly-complete interchange along I-10 in Slidell meant to connect it directly to Business US 190. It's a standard diamond, with auxiliary lanes on the northern side along I-10 running to Exit 266 (US 190, a.k.a. Gause Boulevard).

Structurally, the interchange itself could be used now. Many final touches like fencing, however, are not done yet. Striping on half of the new Business 190 roadbed wasn't started at the time of our stop. Also, no signage is up at the interchange yet.

The interchange was supposed to be done a few months ago, but weather kept delaying it... and then the hurricanes came, pushing it back some more. Normally, all this delay would give me lots of reason to rake LaDoTD and the James Construction Group, who's contracted to do the work, over the proverbial coals, but let's face it. The whole state's gone through a trauma the past couple of weeks. I don't excuse them for the earlier delays. There's other contractors out there that get lots of work building and repairing our roads, and they get the work done lightning-fast. However, since the storms, what's more important?

It'd be nice to get this interchange finished and all, since it should have been done already. Thing is, there are more important things to worry about now, things that will likely require pulling in resources from elsewhere.

Screw the contracts. We've got new priorities now. Suddenly that elevated LA 1 project seems like something we need to get finished yesterday. Getting the new Twin Spans ready to handle traffic is another thing that needs to be on the fastest track possible, in case another storm sweeps in and cripples the old Spans beyond repair in the meantime. Another thing we need to look at is adding lanes to some of our most-used evacuation routes, either in a temporary or permanent capacity. Not to mention non-highway related necessities like modernizing our power grids and restoring our coastline. Let's get them done first, and let's not bitch about things that suddenly don't seem so important anymore.

03 August 2008

Great, now they've got me Flickring...

Ok, so I feel lame, and yet not. Maybe sleep would help.

In the meantime, I got a LOT of snaps today, as well as the ones from last week. I'm talking like 120 of them, taken, cropped and fix0rd in one day. They'll go up on my Photobucket and Accueil sometime during the week, but they're on my Flickr right this minute if you need instant gratification. They're mostly placed by sets for the time being.

I'll be adding the older snaps to the Flickr page as time permits as well.

(Sorry. Lotsa tags apply here.)